The Brearley School
Upper East Side / New York

1994-1995

A rooftop addition to the Brearley School was completed while William was part of the Platt Byard Dovell White design team. The addition increased the number of classrooms and offices and was completed without closing school for more than two weeks. The design seamlessly connects a glass and metal two story enclosure with the existing brick multistory "vertical" school, located at the edge of the East River.


home